Dravit documentation Dravit documentation
Results and sharing

Read quantities, prices and totals

Understand counted scope, row units, price sources, ranges and the limits of a calculated estimate.

Read the estimate as a priced subset of the saved model, with stated assumptions and gaps. A visible total can still omit substantial work.

Summary Meaning
Elements Model elements represented by the calculated estimate. This is not a count of priced table rows or everything in the project.
Net total The counted row subtotals before the project allowances.
With allowances The total after the percentage allowances.
Open issues Missing prices and unresolved model/scope issues. See what they are leads to their explanation.
Prices for The location and original pricing currency of this result. Converted totals identify their exchange rate and date.

Read a row from left to right

In controls whether the row counts; the section's switch controls that section's rows together. An excluded row stays visible and dimmed. Manual lines use their own removal action.

Item identifies the finished element or assumption. A number such as 7× groups matching model elements. assumed means the work was inferred from the building rather than explicitly drawn. Where a Room list is available, expand it to see contributing Room quantities and approximate allocated costs.

Quantity and Unit describe the priced amount. nr means number of items; m, m2, m3, kg and h mean length, area, volume, mass and hours. When a waste addition appears, the smaller note separates measured quantity and the percentage added. unverified norm flags a consumption figure that needs review.

Price is the finished-element rate per unit. project price identifies a project rate; regional guide identifies a rate from the regional catalogue. Subtotal multiplies the counted quantity by that rate. Set price marks an absent rate; its zero subtotal is an omission, not evidence that the work is free.

Range shows a lower-to-upper amount where rate bounds exist. wide market flags a broad spread. This range is an indicative price spread, not a probability or guarantee for the final project cost.

Read Gaps in this estimate before comparing totals. Decorations, furniture and other unsupported work may remain outside pricing. A calculation does not supply a contractor's offer or an engineering validation. Use Versions for a fixed calculated version; compare its totals, including the current allowance limitation, before sharing.

Last updated 4th October 2026